Continuing Education

A New Design Solution to Reduce the Cost and Time of Bridge Construction: GRS-IBS

This program will provide an overview of Geosynthetic Reinforced Soil Integrated Bridge System (GRS-IBS), a bridge design concept being promoted by the Federal Highway Administration to accelerate construction time and offer significant cost savings for the construction of local, county and state bridges. Segmental Retaining Wall (SRW) facing elements, along with geosynthetic reinforcement material, is proving to be a viable solution for a majority of the bridges known to be structurally deficient and in need of replacement across our nation. The presentation addresses the design concept, key materials, specifications and important construction details. A case study example illustrating the construction sequence is also provided.

Approximately 1 hour. Delivered via webinar or face-to-face presentation. Available sessions shown below.

Presented by various experts on behalf of Oldcastle APG. View the Oldcastle APG Privacy Policy

This course is ACTIVELY registered with 3 industry association(s). Show CURRENT course approvals Hide CURRENT course approvals

There doesn't seem to be any scheduled live events for this course. REQUEST one at a convenient time and location for you.